Friday, September 19, 2014

Recent Louisiana Completions

The following completions cover the past two weeks:
  • LSU 30 H #1, Petrohawk Operating: 8.46 MMcf/day IP on 16/64 in. choke at 7,125 psi; Perfs: 12,036-16,503, length: 4,467 ft.; Elm Grove Field, Bossier Parish, S31/T17/R12; res. A, serial #246245 
  • Evans 4 H (recomp) #1, Petrohawk Operating: 8.122 MMcf/day IP on 16/64 in. choke at 6,497 psi; Perfs: 12,084-16,514, length: 4,430 ft.; Caspiana Field, DeSoto Parish, S9/T14/R12; res. A, serial #240277 
  • Gary Lee 8 #1, SWEPI, LP: 11.001 MMcf/day IP on 23/64 in. choke at 7,774 psi; Perfs: 13,162-17,651, length: 4,489 ft.; Bayou San Miguel Field, Sabine Parish, S6/T8/R12; res. A, serial #247117 
  • Gary Lee 5 #1, Petrohawk Operating: 13 MMcf/day IP on 21/64 in. choke at 7,990 psi; Perfs: 13,105-17,798, length: 4,693 ft.; Bayou San Miguel Field, Sabine Parish, S6/T8/R12; res. A, serial #247118

No comments: