Wednesday, May 8, 2013

A Bunch of Texas Completions (Some With Liquids)

4/11/13 - 5/7/13:
OK, so I got a little behind in reporting Texas completions and permits.  But check out the liquids in  wells #2-5 below...
  • W.L. Liston #8H, XTO Energy: 13.859 MMcf/day IP, 17/64" choke, 5,152 psi; Perfs: 10,933-18,685, length: 7,752 ft.; Carthage Field (Haynesville Shale), Panola Co., Survey: TUTTLE, D SR, A-668 
  • CGU 19 #51HH, Anadarko E&P: 5.982 MMcf/day (150 Bbl liquids/day) IP, 18/64" choke, 4,815 psi; Perfs: 10,862-15,699, length: 4,837 ft.; Carthage Field (Haynesville Shale), Panola Co., Survey: DUNCAN, S, A-158 
  • CGU 19 #52HH, Anadarko E&P: 4.942 MMcf/day (107 Bbl liquids/day) IP, 18/64" choke, 5,183 psi; Perfs: 10,744-15,659, length: 4,915 ft.; Carthage Field (Haynesville Shale), Panola Co., Survey: DUNCAN, S, A-158 
  • CGU 19 #53HH, Anadarko E&P: 4.426 MMcf/day (148 Bbl liquids/day) IP, 20/64" choke, 4,840 psi; Perfs: 10,961-16,198, length: 5,237 ft.; Carthage Field (Haynesville Shale), Panola Co., Survey: DUNCAN, S, A-158 
  • Morris Unit #1H, EOG Resources: 4.099 MMcf/day (35 Bbl liquids/day) IP, 27/64" choke, 2,946 psi; Perfs: 11,068-16,830, length: 5,762 ft.; Carthage Field (Haynesville Shale), Panola Co., Survey: PARKER, M, A-527 
  • Alexander Unit #1H, EOG Resources: 11.59 MMcf/day IP, 15/64" choke, 8,774 psi; Perfs: 14,212-19,650, length: 5,438 ft.; Carthage Field (Haynesville Shale), San Augustine Co., Survey: CARTWRIGHT, H, A-80 
  • Rusk 593 B #1H, BP America: 3.916 MMcf/day IP, 18/64" choke, 6,615 psi; Perfs: 12,835-17,202, length: 4,367 ft.; Carthage Field (Haynesville Shale), Shelby Co., Survey: RUSK, CSL, A-593

No comments: