Wednesday, April 10, 2013

New Texas Completions

3/21/13 - 4/9/13:
(check out the long lateral lengths on some of these completions)
  • Holcombe #15H, XTO Energy: 4.299 MMcf/day IP, 17/64" choke, 4,139 psi; Perfs: 10,991-16,465, length: 5,474 ft.; Carthage Field (Haynesville Shale), Angelina Co., Survey: ELLIOT, H, A-241 
  • Robert Walton #10H, XTO Energy: 12.656 MMcf/day IP, 18/64" choke, 6,325 psi; Perfs: 10,932-18,246, length: 7,314 ft.; Carthage Field (Haynesville Shale), Panola Co., Survey: HAMMER, LT, A-335 
  • C.O. Black #12H, XTO Energy: 10.58 MMcf/day IP, 18/64" choke, 5,347 psi; Perfs: 10,857-17,571, length: 6,714 ft.; Carthage Field (Haynesville Shale), Panola Co., Survey: HENRY, SW, A-287 
  • CGU 6 #54HH, Anadarko E&P: 8.374 MMcf/day IP (90 Bbl/day of oil or condensate), 20/64" choke, 5,315 psi; Perfs: 10,881-17,338, length: 6,457 ft.; Carthage Field (Haynesville Shale), Panola Co., Survey: DUNCAN, S, A-158 
  • Smith I Gas Unit #1HB, XTO Energy: 13.678 MMcf/day IP, 27/64" choke, 7,537 psi; Perfs: 12,500-17,695, length: 5,195 ft.; Carthage Field (Haynesville Shale), Panola Co., Survey: ROWE, J , A-585 
  • Bears DU #1H, XTO Energy: 9.599 MMcf/day IP, 15/64" choke, 8,207 psi; Perfs: 12,900-20,453, length: 7,553 ft.; Carthage Field (Haynesville Shale), Panola Co., Survey: ALFORD, MA, A-969

2 comments:

Anonymous said...

Do you have an API # for XTO's Smith I Gas Unit #1HB? I am having trouble finding the well anywhere. Thanks!

Robert Hutchinson said...

Try this: 419-31708

Here is the W-1 link: http://webapps.rrc.state.tx.us/DP/drillDownQueryAction.do?fromPublicQuery=Y&name=SMITH%2BI%2BGAS%2BUNIT&univDocNo=487285002