Thursday, November 8, 2012

Recent Louisiana Completions

  • Boyet 11 #1-ALT, J-W Operating: 7.473 MMcf/day IP on 14/64 in. choke at 8,200 psi; Perfs: 12,584-16,796, length: 4,212 ft.; Woodardville Field, Red River Parish, S11/T14/R9; res. CV-B, serial #233143 
  • Jestma 22 H #2, Petrohawk Operating: 6.49 MMcf/day IP on 14/64 in. choke at 6,816 psi; Perfs: 11,473-16,090, length: 4,617 ft.; Elm Grove Field, Bossier Parish, S22/T16/R11; res. A, serial #244915 
  • Hennigan 1 #2-ALT, SWEPI, LP: 14.106 MMcf/day IP on 18/64 in. choke at 8,340 psi; Perfs: 13,069-17,711, length: 4,642 ft.; Bracky Branch Field, Red River Parish, S36/T14/R10; res. A, serial #244230 
  • Sustainable Fst 1 #1, SWEPI, LP: 8.799 MMcf/day IP on 22/64 in. choke at 6,747 psi; Perfs: 12,871-15,530, length: 2,659 ft.; Liberty Field, Red River Parish, S3/T12/R8; res. A, serial #244374

No comments: