Tuesday, January 17, 2012

New Texas Completions

1/10/11 - 1/17/11:

  • Walker SU H #1H, EXCO Operating: 13.674 MMcf/day IP, 16/64" choke, 10,105 psi; Perfs: 14,966-19,947, length: 4,981 ft.; Carthage Field (Haynesville Shale), Nacogdoches Co., Survey: WALKER, J, A-57
  • CGU 12 #51HH, Anadarko E&P: 3.615 MMcf/day IP, Adj./64" choke, 3,515 psi; Perfs: 11,143-14,741, length: 3,598 ft.; Carthage Field (Haynesville Shale), Panola Co., Survey: WHITE, JA, A-749
  • CGU 12 #16HH, Anadarko E&P: 4.098 MMcf/day IP, Adj./64" choke, 3,851 psi; Perfs: 11,137-14,866, length: 3,729 ft.; Carthage Field (Haynesville Shale), Panola Co., Survey: WHITE, JA, A-749
  • Horton Fed #1H, Chesapeake Operating: 17.042 MMcf/day IP, 22/64" choke, 6,997 psi; Perfs: 12,907-16,500, length: 3,593 ft.; Carthage Field (Mid-Bossier), Sabine Co., Survey: MCADAMS, J JR, A-159
  • West Spoon GU SBN #1H, Chesapeake Operating: 15.183 MMcf/day IP, 22/64" choke, 7,138 psi; Perfs: 13,342-17,367, length: 4,025 ft.; Carthage Field (Haynesville Shale), Sabine Co., Survey: RENFRO, D, A-181
  • Frazier Fed #1H, Chesapeake Operating: 15.443 MMcf/day IP, 22/64" choke, 6,532 psi; Perfs: 13,728-17,375, length: 3,647 ft.; Carthage Field (Haynesville Shale), Sabine Co., Survey: FRAZIER, W B , A-100
  • Richards GU SBN #1H, Chesapeake Operating: 16.495 MMcf/day IP, 22/64" choke, 7,070 psi; Perfs: 12,749-17,447, length: 4,698 ft.; Carthage Field (Haynesville Shale), Sabine Co., Survey: HARTON, J, A-114
  • Marquette #1H, SM Energy: 14.926 MMcf/day IP, 20/64" choke, 9,200 psi; Perfs: 13,850-19,551, length: 5,701 ft.; Carthage Field (Haynesville Shale), San Augustine Co., Survey: BEATY, J, A-63

No comments: