Thursday, March 31, 2011

New Louisiana Completions

Only a few new Louisiana completions reported by the LA DNR this week, including some old ones (not included here).

  • Slattery 14-16-14 H #1, Chesapeake Operating: 14.065 MMcf/day IP on 22/64 in. choke at 6,790 psi; Perfs: 11,591-16,098, length: 4,507 ft.; Cedar Grove Field, Caddo Parish, S14/T16/R14; res. A, serial #241382
  • Winters 1-16-15 H #1, Chesapeake Operating: 14.064 MMcf/day IP on 22/64 in. choke at 6,261 psi; Perfs: 11,606-16,069, length: 4,463 ft.; Metcalf Field, Caddo Parish, S1/T16/R15; res. A, serial #241394
  • Chaffin Heirs 4 H #2-ALT, El Paso: 12.94 MMcf/day IP on 16/64 in. choke at 7,450 psi; Perfs: 12,197-16,625, length: 4,428 ft.; Holly Field, DeSoto Parish, S4/T13/R14; res. A, serial #241337

No comments: