Thursday, March 17, 2011

New Louisiana Completions

  • Butler 30 H #1, Petrohawk Operating: 8.374 MMcf/day IP on 14/64 in. choke at 8,731 psi; Perfs: 12,621-17,200, length: 4,579 ft.; Swan Lake Field, Bossier Parish, S31/T15/R10; res. A, serial #241360
  • Morris et al 2-16-15 H #1, Chesapeake Operating: 13.512 MMcf/day IP on 22/64 in. choke at 6,419 psi; Perfs: 11,525-15,987, length: 4,462 ft.; metcalf Field, Caddo Parish, S2/T16/R15; res. A, serial #241506
  • Shirey 21 H #1, Comstock Oil & Gas: 5.544 MMcf/day IP on 14/64 in. choke at 6,075 psi; Perfs: 11,760-15,806, length: 4,046 ft.; belle Bower Field, DeSoto Parish, S21/T13/R16; res. A, serial #241323
  • Shirey 21 H #2, Comstock Oil & Gas: 5.35 MMcf/day IP on 14/64 in. choke at 5,929 psi; Perfs: 11,682-15,754, length: 4,072 ft.; belle Bower Field, DeSoto Parish, S21/T13/R16; res. A, serial #241660
  • Chapman Heirs 27 H #1, El Paso: 17.287 MMcf/day IP on 20/64 in. choke at 7,650 psi; Perfs: 12,170-16,298, length: 4,128 ft.; Holly Field, DeSoto Parish, S27/T14/R14; res. A, serial #240753
  • Franklin et al 3 H #2-ALT, El Paso: 14.994 MMcf/day IP on 18/64 in. choke at 7,100 psi; Perfs: 12,285-16,516, length: 4,231 ft.; Holly Field, DeSoto Parish, S3/T13/R14; res. A, serial #241697
  • Rex Young 8 H #2-ALT, QEP Resouces: 11.321 MMcf/day IP on 18/64 in. choke at 8,300 psi; Perfs: 12,610-17,100, length: 4,490 ft.; Thorn Lake Field, Red River Parish, S17/T14/R11; res. A, serial #241535
  • JM Raeburn et ux 23 H #1, Forest Oil: 11.513 MMcf/day IP on 16/64 in. choke at 8,713 psi; Perfs: 13,005-16,642, length: 3,637 ft.; Woodardville Field, Red River Parish, S23/T14/R10; res. A, serial #240740
  • Fisher et ux 20 H #1, El Paso: 8.764 MMcf/day IP on 14/64 in. choke at 6,700 psi; Perfs: 12,155-15,871, length: 3,716 ft.; Bethany Longstreet Field, DeSoto Parish, S20/T14/R15; res. A, serial #241847 (updating self-reported data from El Paso)
Maps and spreadsheet will be updated tomorrow.

No comments: