Monday, July 26, 2010

New Louisiana Completions

  • Waschka 10 H #1-ALT, Petrohawk (KCS): 7.754 MMcf/day IP, on 14/64 in. choke, at 7,754 psi; Elm Grove Field, Bossier Parish, S15/T16/R11; res. A, serial #240517
  • San Patrico 7 H #2, EnCana Oil & Gas: 17.488 MMcf/day IP, on 23/64 in. choke, at 8,861 psi; Benson Field, DeSoto Parish, S7/T10/R12; res. A, serial #240440
  • Blackstone 4 #1, SWEPI, LP: 2.976 MMcf/day IP, on 24/64 in. choke, at ? psi; Trenton Field, DeSoto Parish, S4/T11/R13; res. A, serial #239851
  • Chaffin Heirs 9 H #1, El Paso: 15.233 MMcf/day IP, on 20/64 in. choke, at ? psi; Holly Field, DeSoto Parish, S9/T13/R14; res. A, serial #240287
  • Jack R. Gamble 11 H #2-ALT , El Paso: 9.89 MMcf/day IP, on 20/64 in. choke, at ? psi; Bethany Longstreet Field, DeSoto Parish, S11/T13/R15; res. B, serial #240933
  • Getulio Brewer 3 H #1, EnCana Oil & Gas: 23.717 MMcf/day IP, on 33/64 in. choke, at ? psi; Bracky Branch Field, Red River Parish, S34/T14/R10; res. A, serial #240551
I will lump these completions in with last week's on the spreadsheet and upload a revised version.  I will also update the maps.

No comments: