- Willis 25 H #1, Petrohawk Operating: 21,361 MMcf/day initial production on 20/64" choke at 8,441 psi; Elm Grove Field, Bossier Parish, Sec 36/Township 16/Range 11; Haynesville reservoir A, serial #240009
- Wright ETAL 17 H #1, Exco Production: 8,840 MMcf/day IP on 20/64" choke at 4,202 psi; Bethany Longstreet Field, Caddo Parish, S17/T15/R16; res. A, serial # 239840
- Graves 24 H #1, Chesapeake Operating: 13,704 MMcf/day IP on 22/64" choke at 5,848 psi; Greenwood-Waskom Field, Caddo Parish, S24/T16/R16; res. A, serial #239581
- Phillips Foundation 3H #1, Chesapeake Operating: 13,507 MMcf/day IP on 22/64" choke at 5700 psi; Greenwood-Waskom Field, Caddo Parish, S3T/16R/6; res. A, serial #239793
- Woolley 17-16-15 H #1, Chesapeake Operating: 14,728 MMcf/day IP on 22/64" choke at 6,571 psi; Johnson Branch Field, Caddo Parish, S17/T16/R15; res. A, serial # 240105
- BSMC LA 9 HZ #1, Comstock Oil & Gas : 9,587 MMcf/day IP on 26/64" choke at 5,154 psi; Benson Field, DeSoto Parish, S16/T10/R14; res. A, serial #239384
- Matthews Trust 7 #1, Petrohawk Operating: 20,111 MMcf/day IP on 22/64" choke at 8,988 psi; Red River-Bull Bayou Field, DeSoto Parish, S7/T13/R11; non-unitized, serial #239425
- Black Stone Minerals LP 26H #1, Forest Oil Corp.: 5,432 MMcf/day IP on 10/64" choke at 7,635 psi; Converse Field, Sabine Parish, S26/T8/R14; res. A, serial #239521 (this completion occurred in March, 2009 but had been shut-in wating for pipeline)
Friday, February 5, 2010
New Louisiana Completions
Subscribe to:
Post Comments (Atom)

0 comments:
Post a Comment