Wednesday, October 14, 2009

Recent Louisiana Completions

I noted the following recent Louisiana completions:

  • NAC 36 H #1, Questar: 17.223 MMcf/day IP on 18/64” choke at 8,300 psi; completed August 22, Woodardville Field, Bienville Parish, Sec. 36/Township 15/Range 10; Haynesville reservoir A, serial #239751
  • Ninock 35H #1, Petrohawk: 20.37 MMcf/day IP on 24/64” choke at 7,750 psi; completed August 16, Swan Lake Field, Bossier Parish, S35/T15/R11; Haynesville res. A, serial #239780
  • Ninock 34 H #1, Petrohawk: 21.8 MMcf/day IP on 24/64” choke at 8,228 psi; completed August 22, Swan Lake Field, Caddo Parish, S34/T15/R11; Haynesville res. A, serial #239801
  • Hearne 21 H #1, Chesapeake Energy: 4.393 MMcf/day IP at 3,197 psi (choke unknown); completed August 3, Johnson Branch Field, Caddo Parish, S21/T16/R15; Haynesville res. A, serial #239549
  • Mary Belle Smith 28 #1, BEUSA Energy: 9.391 MMcf/day IP on 16/64” choke at 7,400 psi; completed May 6, Bethany Longstreet Field, DeSoto Parish, S28/T13/R15; Haynesville res. B, serial #238978
  • Susie B Osby ETAL 14 #2, J-W Operating: 7.608 MMcf/day IP on 22/64” choke at 6,250 psi; completed August 12, Caspiana Field, DeSoto Parish, S14/T15/R13; Haynesville res. A, serial #239475
  • Gibbs 3 H #1, Chesapeake Energy: 9.151 MMcf/day IP on 16/64” choke at 7,469 psi; completed August 25, North Grand Cane Field, DeSoto Parish, S3/T21/R14; Haynesville res. A, serial #239400 (previously listed as shut-in waiting for pipeline)
  • Smithburg 7 H #1, Chesapeake Energy: 7.923 MMcf/day IP on 14/64” choke at 7.923 psi; completed August 28, Red River-Bull Bayou Field, DeSoto Parish, S7/T13/R12; Haynesville res. A, serial #239228 (previously listed as shut-in waiting for pipeline)
  • Billingsley 35 #1, EOG Resources: 11.563 MMcf/day IP on 28/64” choke at 4,600 psi; completed July 23, Trenton Field, DeSoto Parish, S35/T12/R13; Haynesville res. A, serial #239599

The Louisiana Completions Database is updated with this information.

No comments: