Sunday, October 4, 2009

New Louisiana Completions

I noted the following Haynesville completions in Louisiana this weekend.

  • Johnson 10H, Chesapeake Operating: 10.268 MMcf/day initial production on 18/64" choke at 7,500 psi; Bethany Longstreet Field, DeSoto Parish; serial #238486 (previously reported by a Goodrich Petroleum press release at 17 MMcf/day at 22/64" choke)
  • Cowley 2, J-W Operating: 12.0 MMcf/day IP on 24/64" choke at 4,500 psi; Elm Grove Field, Bossier Parish; serial #239245
  • White 16 #2, Palmer Petroleum, Inc.: 10.903 MMcf/day IP on 20/64” choke; Caspiana Field, DeSoto Parish; serial #239267
  • Bobby Dyson 21H, EnCana: 6.994 MMcf/day IP on 19/64” choke; Caspiana Field, DeSoto Parish; serial #239783
  • Broome HZ, Comstock Oil & Gas: 15.981 MMcf/day IP on 30/64” choke; Belle Bower Field, DeSoto Parish; serial #239289
  • Renfro ETAL 14, Petrohawk Operating: 7.643 MMcf/day IP on 14/64” choke; Red River-Bull Bayou Field, DeSoto Parish; serial #239306
  • Blackstone ETAL 23H, Chesapeake Operating: 3.764 MMcf/day IP on 18/64” choke; Logansport Field, DeSoto Parish; serial #239373
  • LP Ware Farms 22H, EnCana: 17.611 MMcf/day IP on 20/64” choke; Bracky Branch Field, Red River Parish; serial #239622
  • Connie Grzesiek 8H, EnCana: 10.771 MMcf/day IP on 13/64” choke; Woodardville Field, Red River Parish; serial #239667

No comments: